Differences between revisions 2 and 5 (spanning 3 versions)
Revision 2 as of 2010-11-12 02:10:14
Size: 636
Editor: clifford
Comment:
Revision 5 as of 2013-09-18 06:09:34
Size: 779
Editor: localhost
Comment: converted to 1.6 markup
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
 1. their server ip and port, enter in epaycont,
 1. enter the terminal id they provided, in to teaad , and specify which server will be used
 1. copy the terminal id to to mac , for encryption, run eprstmim
 * their server ip and port, enter in epaycont,
 * enter the terminal id they provided, in to teaad , and specify which server will be used
 * copy the terminal id to to mac , for encryption, run eprstmim
Line 10: Line 10:
 * 5, to do an top up transaction , the pan need to be scan in the comment or entered to the comment field  * 5, to do an top up transaction , the stock desc need to start with "TELSTRA " note there is a space behind the A, the pan need to be scan in the comment or entered to the comment field
regarding development , the response text is actually 2000 char

setting up epay,

  • 1, detail needed
  • their server ip and port, enter in epaycont,
  • enter the terminal id they provided, in to teaad , and specify which server will be used
  • copy the terminal id to to mac , for encryption, run eprstmim
  • 2, need to set up epay supplier with code EPAY
  • 3 ,set up stock , where using EPAY as one of its supplier the line entered should have whole positive number qty and amount .
  • 4, to set up an voucher product , the pan of the product should be stored in the attribute
  • 5, to do an top up transaction , the stock desc need to start with "TELSTRA " note there is a space behind the A, the pan need to be scan in the comment or entered to the comment field

regarding development , the response text is actually 2000 char

epay.html (last edited 2013-09-18 06:09:34 by localhost)